Yesterday morning started out loud. The Know Sweat team dropped off some much needed supplies, including a chain saw to finish the job of pulling out the front bushes. Rick handled it like a logging champion and had cut down the remaining trunk of the bushes in no time. The students look on in awe. Often times we will allow students to get more hands on with tools on a mission trip, to help them experience something new. This time we decided against it. I think I have had nightmares of Mike Provo handling a chainsaw. We opted for Rick to go for it-he did great.
I took Tori and Cristina and made a run to the hardware store so we could pick up supplies to begin work on the back room that we were finishing to convert into a play room for Cary Lynn. I believe in my last post I called the young girl Cara Lee. Her name is Cary Lynn though, my mistake (close enough) :)
Tori and Cristina helped me grab some paint, mud, trough, drywall tape, sandpaper and a full slab of 5/8 drywall to finish the ceiling in the den. It was important that we move quickly on this, because we needed to get the drywall hung, taped, and puttied so it would have enough time to dry so we could begin painting today.
When we arrived back the students were busy at work. Some of the boys were prepping the back room. Jacob and Casey were taping edges so we could begin painting those, Jon Z worked his way around the room patching up old holes. Tori, Sarah, Cristina and Payton were doing an amazing job in the kitchen, cutting and placing tiles. James, Mike and others continued to work hard at the unending task of tidying up the yard.
Rick and I pulled down the previously botched ceiling job so we could fit the new piece in its place. We were able to pull down the old piece easily, and had to do some trimming of the ceiling the was in place around it so we could snugly fit the new piece in to complete the ceiling. This was an incredibly hard task. It is incredibly difficult to fit a 4x8 piece of sheetrock into a corner of a ceiling space. Hanging drywall up on walls can be pretty simple, but holding it up with gravity and tight spaces working against you is quite a task. Soon we had Casey, Mike, James, Jonathan and others taking turns hold up the drywall while Rick and I trimmed and worked it into place. It took almost an hour just to get it secured, but it was very rewarding when we were done.
While Rick and I starting taping and mudding the ceiling piece, Sarah and Anna took cups of paint with brushes and began working on edges, which was a huge help and allowed us to quickly roll the paint on today.
Ellis worked with a few others to put up the swing set outside and finish putting it together.
The day ended well. We had accomplished much and set ourselves up to get lots done today. We even realized yesterday that we had worked so efficiently and gotten so much done that we probably would run out of work for everyone today. It was a good predicament for us to have.
We left the site exhausted and ready for showers. We headed home to clean up, have dinner, and encounter God in worship.
After our evening session we made a trip to Wal Mart. The students all had some things they needed to pick up, and Rick, Ellis and I had thought of another project to keep us busy today. As I had said previously the yard was in much need of work. There is a nice horse fence around the perimeter of the yard. At one time there was mulch there, but it was all gone and the black yard paper was all that was showing. So we decided to pick up mulch to add to the look in the front of the house. We loaded up 15 bags at the Wal Mart garden center and headed home.
As soon as my head hit the pillow I was out. Somehow the girls had enough in them to work on mad libs til 1 AM, and the boys had enough in them to get up at 6:30 today to shave Mike Provos head bald. Sorry Gail. I had nothing to do with it :)
This morning as we headed to the site there was lots to do. There was still some detail tiling work to get done in the kitchen. The den needed to be sanded and painted. The mulch needed to be spread. We also had a full size dumpster delivered to load all the garbage furniture and bush trimmings into and get rid of.
Everyone got to work quickly and stayed busy. The mulching was done so quickly that I had to go get 10 more bags so the students could work on some other areas that could have used it. Jacob and Casey were the mulch kings. They got it done! Rick and I finished sanding the ceiling piece we put up and Payton, Sarah, James and others got to work painting the walls and ceiling of the new playroom. Jack, Jonathan, Sarah, Anna and many others worked hard and diligently tearing apart furniture and breaking down brush so everything get fit in the dumpster below the load line. Tori and Cristina finished some detail work on the kitchen tile. Its amazing what they got done. I was shocked at the change in the kitchen. Well done girls. Tori had a minor incident with a utility knife when she was trimming the tiles, she nicked the end of her thumb when she was cutting a tile-so she even has a sweet war wound to show for all her tile work. After a little clean swab and a band-aid, she was good as new though.
We spent a couple hours getting everything cleaned up, picking up tarps, taking down tape, cleaning the floors, sweeping up dirt outside. As we stepped back and looked at everything when the day was done, it was a good feeling. We have accomplished more than anyone expected us to. We were patient with one another, we had fun, we worked hard-more importantly, Christ lived in us and through us. Its only by the grace of God you can shove 14 people in a van for 16 hours, make them work in dirty places, in scorching heat and have everyone come out of it closer than when they went in.
It was a good week. I was able to talk with many of the students one on one about what God is doing in their hearts. God has been working, as I expected him to. Some of the students are starting to grasp and understand the idea of a life that is fully surrendered to God. Its everything that I pray for.
Tomorrow we will head back to Melissa's one more time to say goodbye, before we have a day of fun rafting on the Arkansas River in Brown's Canyon in Buena Vista, CO. Everyone is looking forward to it. The cold mountain water will feel good!
More tomorrow.